Skip To Main Content

Permanent Improvement Funds

The Cleveland Heights-University Heights City School District passed a Permanent Improvement Levy in 2001. This levy generates $3 million annually to fund facility maintenance, repairs, and improvements throughout the District. The annual projects completed with Permanent Improvement funds are listed below, including what is planned for future projects.

The District utilizes numerous resources to help identify facility needs and prioritize them. Some of these evaluations and reports include:

  • 2007 District Wide Facilities Evaluation (Irie Kynyk Goss Architects)
  • 2009 Roof Management Plan (Taylor Consulting)
  • 2010 Facilities Assessment Report (Collaborative Inc for the Ohio Schools Facility Commission OSFC)
  • 2012 Enhanced Environmental Report (Lawhon & Associates for the OFSC)
  • 2015 Playground Development (McKnight & Associates)
  • 2016 Roof & Facade 10-year program (Taylor Consulting)
  • 2017 Capital Asset Condition Report (K2M Design)
  • 2022 District Elementary Cooling Study (GPD Architects)
  • 2023 Roof & Facade 10-year program (Taylor Consulting)
  • 2023 District HVAC Assessment (GPD Architects)

The Director of Business Services and Operations utilizes the most recent information and assessments to develop a ten-year plan, prioritizing the facility needs within the available permanent improvement funds. The ten-year plan is fluid and may change based on educational plans of the District and the needs of our students.

Scroll down to see the projects scheduled in the current fiscal year plan and the projects that the District has completed since 1998.

2025-2026 PLANNED PROJECTS

Building Item
Delisle Options Center Makerspace
District Wide Pavement Improvements
High School Gymnasium Floors Refinished
High School Replace Pool Back Wash System
Monticello Boiler Replacement
Oxford Wind Damage Shingle Roof Replacement
Roxboro Middle Wind Damage Single Roof Replacement
Roxboro Middle Bleacher Replacement

 

2024-2025 CURRENT PROJECTS

Building Item
BOE Chair Lift Replacement
BOE Bus Replacements
Boulevard Fire Alarm System
Boulevard Rooftop HVAC Replacements
Bus Camera Replacements Camera Replacements
Canterbury Roof Repairs from Wind Damage
Delisle Options Center IT Main Data Room HVAC Replacement
District Wide Wide Camera Replacements
Fairfax Downspout Repairs
Gearity Elementary School Playground Improvements
High School School Coil Replacement 
High School School Loading Dock
High School Floor Scrubber
High School NVR Replacement
Monticello Roof Repairs from Wind Damage
Monticello Kitchen Entrance Doors 
Noble  Cafeteria Doors
Oxford Truck Pointing
Oxford Downspout replacement
Roxboro Middle Middle Tunnel Slab Repairs
Roxboro Elementary Playground Equipment
Workman's Comp Safety Grant Cleaning Equipment

Past Projects