PRINT ARTICLE

Print    Close This Window
PHOTOS: Heights High Construction Update
Jan. 12, 2017 -- See the latest photos of what's happening inside Heights High on the renovation project from Gilbane Construction. The completely renovated building is on schedule to be finished in time for the start of the 2017-2018 school year.
*Click on the photo for larger image.

Metal Stud Framing in the Auditorium

Metal Stud Framing in the Auditorium

3rd Floor Carpet Tile Installation

3rd Floor Carpet Tile Installation

3rd Floor Rubber Flooring Installation

3rd Floor Rubber Flooring Installation

Metal Stud Framing in Vocal Music Level

Metal Stud Framing in Vocal Music Level

3rd Floor Sink and Toilet Installation

3rd Floor Sink and Toilet Installation

Drywall Installation

Drywall Installation on Cedar Level

Previous Multimedia Updates: